7Waves AS

Sectors

FLNG Terminals

Floating LNG (FLNG) facilities represent some of the most demanding marine structures in the energy sector. 7Waves provides engineering support for FLNG units, FSRUs, and associated terminal infrastructure — from concept through operations.

Our work includes hydrodynamic analysis of large floating bodies, mooring system design and verification, riser and offloading system engineering, and structural assessment of topsides and hull structures under combined environmental and operational loading.

We support clients with analysis aligned to DNV, ISO, and project-specific requirements, providing the technical basis for safe mooring, offloading operations, and long-term asset integrity.